Release time: Mar. 13, 2024
Julisling provided a complete lifting system to assist in the construction of the "Ocean Oil 122" floating production, storage, and offloading (FPSO) facility. The lifting system was required to precisely lower functional modules weighing over a thousand tons from a height of nearly one hundred meters, with assembly clearances of less than ten centimeters, without any collisions. Faced with this challenging lifting project, Julisling successfully met the requirements and completed the project smoothly.





W01-4 Eye Type Polyester Webbing Sling
Shackle
Compacted Steel Wire Rope
Endless Type Webbing Sling W03-01 | Webbing Slings by Juli Sling
Protection Type Round Sling
Electric Translational Slab Clamp
Heavy Eye Webbing Sling W02-08 | Webbing Slings by J&L
JQS1000 Bridge Erecting Crane
6×36WS+IWR Steel Core Steel Wire Rope