About us
Media
News
Celebrating New Beginnings: Juli Sling’s Spring Festival Wishes for a Prosperous Year of the Snake
JULI SLING: Empowering Another World’s Best Achievement
From Accomplishments to Aspirations: Our 2024 Achievements and 2025 Vision
Here, we utilize advanced specialized and automated equipment to ensure each wire rope is produced with efficiency and precision.
Juli Sling was invited to participate in the OWA Expo 2024, which was grandly opened on October 30th in Shanghai.
The on-site commander successfully positioned the 1,700-ton first precast box girder onto the piers of the nation's first cross-sea bridge for suburban (intercity) railways on November 5. Modern lifting equipment owned by Juli Sling helped accomplish this feat.
The elevator link is a critical part that connects the Top Drive, a drilling mechanism that suspends and rotates the drill string from the rig floor, allowing for easier and more efficient drilling operations, to the drill pipe or drill collar, providing support and facilitating the transfer of torque and weight during drilling activities. It he
Julisling provided lifting equipment for the installation of anti-collision steel casings for the main tower of Qinglongmen Bridge. These anti-collision steel casings are equivalent to 11 basketball courts, with a total length of approximately 86 meters, a total width of approximately 48 meters, a height of 9.8 meters, and a total weight of 2,400 t
Julisling Assists In The Hoisting of The CV Bottom Head of Xudabao Nuclear Power Unit 1